thue may photocopy

US$11mil. to upgrade Saigon-Nha Trang railway route

PDFPrintE-mail

The Vietnam Railway Corporation (VNR) has proposed the Ministry of Transport to work out a project to improve the operation of the train on the Saigon-Nha Trang route with the aim of increasing capacity, minimizing the risk caused by human errors.

US$11mil. to upgrade Saigon-Nha Trang railway route, social news, vietnamnet bridge, english news, Vietnam news, news Vietnam, vietnamnet news, Vietnam net news, Vietnam latest news, vn news, Vietnam breaking news

The Saigon - Nha Trang railway route is 411.2km long with 36 train stations. As per proposal, this project will help improve railway infrastructure by applying a unified regulatory center and active safety systems, reducing the number of concurrent parking stops, thus increasing the railway throughput by 35-40 percent.

Consequently, that will save energy and reduce costs of repairing moving parts of trains and railways by 15-20 percent. The project also contributes to ensuring the safety and raising the speed of the train and minimizing the number of accidents owing to preventing the risk of passing red lights, exceeding speed limits, colliding other trains...

by using the equipment to protect the train automatically. Furthermore, it also helps to control the entire work of the train drivers, to assist in early notification of trains approaching the crossroads guarded by sentry men to improve safety at negligible expenses.

In case it is approved, VNR leaders say, the project is expected to be implemented within 18 months. The total cost of equipment, including installation and technical assistance by experts is about US$ 10.83 million, equivalent to VND 245.6 billion (if German equipment is used) or US$11 million (nearly VND 250 billion) if German equipment is not used.

The consultant proposed a formula of cooperation in the form of BT (build-transfer), in which investors bear 70% and the Vietnam government invests 30% of the capital. The government will reimburse the investment cost to the investors after the project goes into operation. According to VNR, if the study and implementation of the project on the Nha Trang – Saigon route prove safe and effective, this will lay the basis for consideration and implementation of other similar projects.

Source: VietNamNet

Related news items:
Newer news items:
Older news items:

Massage Vietnam

euro super

 

 

 

 

 

Auto Leaf Spring by 19-8 Mechanical JSC Company

bóng đèn

Bioscope health care Innovation

anduy interior

 

du lịch biển thiên cầm

Latest News

Tuan finishes second at Singha TATP Tour

Tuan finishes second at Singha TATP Tour

Vietnamese tennis player...
22 May 2018
$100m programme to train teachers

$100m programme to train teachers

Nearly 28,000 high school...
22 May 2018
Beach tours popular this summer: travel firms

Beach tours popular this summer: travel firms

Travel firms in HCM City...
22 May 2018
Localities asked to prevent Ebola from entering Vietnam

Localities asked to prevent Ebola from entering Vietnam

The health sector has...
22 May 2018